Bültmann & Gerriets
Evaluating Water Projects
Cost-Benefit Analysis Versus Win-Win Approach
von Per-Olov Johansson, Bengt Kriström
Verlag: Springer Berlin Heidelberg
Reihe: SpringerBriefs in Economics
E-Book / PDF
Kopierschutz: PDF mit Wasserzeichen

Hinweis: Nach dem Checkout (Kasse) wird direkt ein Link zum Download bereitgestellt. Der Link kann dann auf PC, Smartphone oder E-Book-Reader ausgeführt werden.
E-Books können per PayPal bezahlt werden. Wenn Sie E-Books per Rechnung bezahlen möchten, kontaktieren Sie uns bitte.

ISBN: 978-3-642-36790-8
Auflage: 2013
Erschienen am 08.04.2013
Sprache: Englisch
Umfang: 67 Seiten

Preis: 53,49 €

53,49 €
merken
zum Hardcover 53,49 €
Biografische Anmerkung
Inhaltsverzeichnis
Klappentext

Per-Olov Johansson is Professor emeritus in economics at the Stockholm School of Economics. He has held a professorship (II) in health economics at the department of Economics at the University of Oslo and a professorship in resource and environmental economics at the Swedish University of Agricultural Sciences, Umeå. He has published more than 10 books internationally and more than 100 journal articles and book chapters.

Bengt Kriström is Professor of Resource Economics (SLU-Umeå) and Research Director, CERE, Sweden. His research is widely cited (top 1000 economists according to a 2002 compilation) and includes 50+ papers and 10 books. He has been a consultant to several international organizations, including the OECD and, at numerous occasions, the Swedish Government. He has organized the Ulvön International Conference on Environmental Economics since 1993.



Preface.- 1 Introduction.- 2 The Dönje Hydropower Scenario.- 3 The -2,+1 Hydropower Scenario.- 4 A Brief Comparison of the Approaches and an Outlook.- References.- Appendices.- Index.



Should more water be diverted to or from electricity generation? This timely question is addressed in this short volume. Two different approaches are introduced and compared:
The first is a cost-benefit analysis, examining the case of re-regulating a Swedish hydropower plant in which water is diverted from electricity generation to the downstream dryway. The proposed scenario generates environmental and other benefits, but comes at a cost in terms of lost electricity.
The second study introduces an approach very different from the one used in conventional cost-benefit analysis, and provides a set of measures designed so that most, if not all, affected parties will be better off. Thus, in contrast to a conventional cost-benefit analysis, which draws on hypothetical compensation measures, the new approach envisages actual compensation.
Comparing two different theoretical frameworks on the basis of a real-world case, this study can be seen as a manual that can be used to evaluate reasonably small re-regulation of rivers.


andere Formate
weitere Titel der Reihe